HVAC Malfunction - Building A, Floor 3
Plan
Activity
Log the incoming request from Sarah Chen regarding temperature issues in Zone 3-East. Verify contact details and capture the initial complaint for the HVAC system.
Classify the issue and assess business impact. Given that executive offices are located in Zone 3-East, escalate priority if comfort is significantly affected.
Pull BMS sensor data for Zone 3-East and cross-reference with AHU-3E readings. Review the maintenance-log.xlsx to check for any recent service that might explain the anomaly.
Dispatch technician to inspect the AHU and identify root cause.
- Schedule technician dispatch
- Confirm site access with building security
- Inspect AHU-3E unit
- Document findings with photos inspection-report.pdf
- Check refrigerant levels
- Test thermostat calibration
- Check supply air temperature 3/3 temp-readings.csv
- Verify actuator control signal 2/4
- Measure differential pressure 0/2
- Verify return air flow rate 2/2 airflow-report.pdf
- Inspect fan belt tension 0/3
Based on findings from the on-site inspection, determine if a replacement valve actuator is needed for AHU-3E. Check stock availability and create a purchase-order.pdf if procurement is required.
Have Mike Torres replace the faulty cooling coil valve actuator on AHU-3E. Document all work performed and update the asset service history.
After repair, monitor Zone 3-East temperatures via BMS for at least 30 minutes. Confirm supply air from AHU-3E reaches the 70°F setpoint before proceeding.
Contact Sarah Chen to confirm comfort has been restored in Zone 3-East. Once verified, close the case and update the AHU-3E service record with repair details.